The group has taken component in the generating and revising of ISO/TC100 worldwide chain regular many a long time in success and hosted the 16th ISO/TC100 Worldwide annual meeting in 2004. Our experts and engineers have 23 many years of Knowledge in the Bearing Market. we are confident to offer our customers versatile and diversified companies. We manufacture and supply all sort of drilling EPT for minming sector and construction subject time period
Excellent price comma best top quality comma exellent service period of time
Please get in touch with us for thorough information interval
GP590C Crawler EPT DTH Drilling Rig EPT Speicifications | |
Drilling diameter | Phi90- Phi165 |
Drilling depth | 50m |
Pipe-rod changing size | 3m |
MaXiHu (West Lake) Dis.mum horizontal angle of drilling growth | remaining and proper forty five deg |
MaXiHu (West Lake) Dis.mum inclinable angle of sliding framework | 180 deg |
Working air stress | two period5Mpa |
Velocity of flip-about EPT | -sixty RPM |
Rotary torque | 3000 Nm |
Sliding framework stroke | 4356mm |
MaXiHu (West Lake) Dis.mum horizontal drilling height | three period37m |
Applicable rock hardness | f equals6-twenty |
Relocating speed lpardual speed rpar | 2km solh comma 3km solh |
Gradeability | thirty deg |
Motor | Yuchai 70KW EPT 74KW Electric forty five sol30KW |
Overall dimension lparlenght timeswidth timesheight rpar | 7000 times2200 times2100 lpartransportation point out rpar |
Fat | 6500kg |
De-dusting strategy | |
Design | GPC sequence |
Soot cleaning method | EPTulse reverse wind |
EPT size | Phi200- Phi600 |
EPT substance | EPTester filter material |
EPT amount | six |
Water tank | Damp type EPT dust removing |
GP590C solGP590 EPT Generation Crawler EPT DTH Drilling Rig
GP590C solGP590 EPT Era Inner Combustion lparElectric rpar Crawler EPT DTH Drilling Rig is the update solution of GP580 comma which possesses more enhanced operate comma much more XiHu (West Lake) Dis.Hu (West Lake) Dis.n-oriEPTd design and style and reduced drilling footage EPT period It is geared up with diesel engine lparelectromotor rpar—-EPT oil pump device as its EPT unit comma and achieves the supporting actions this kind of as rotation comma propulsion comma lifting comma moving comma pivotangle orientation of EPT oil cylinder through EPT motor interval When the GP590C solGP590 is carrying out drilling functions comma only DTH impactor will take in the compressed air comma When compared with the EPT-pneumatic drilling rig comma the air displacement of matched air compressor is decreased by 30 percnt-fifty percnt comma and the consumption of energy lparfuel or electrical energy rpar is 40 percnt to fifty percnt throughout procedure interval
GP590 new technology comma which additionally equipped with product of environmental pleasant EPT dust removing program comma constitutes GP590C period Drilling internet site meets the conditions of h2o can also adopt wet dust removal system time period
GP590C solGP590 EPT Technology Internal Combustion lparElectric rpar Crawler EPT DTH Drilling Rig are mostly used for drilling blasting hole in the filed of water-EPT engineering comma open-cast mining comma roadways building comma national defence building and so forth interval time period time period
Change-close to EPT
Massive rotary torque comma the construction of newly
created planetary reduction box is a lot more
compact than that of straight-tooth type
EPT with increased reduction ratio comma more
successful torque minute EPT comma and
far more clean procedure interval It doesn apost want
further elements this sort of as damping joint for
EPT absorption time period The failure rate is lower
which lowered schedule maintenance EPT comma The
unconsolidated layer is not effortlessly sticking comma
large pore-forming fee period
The EPTed rotary sealing elements very own
exceptional sealing and services daily life period
EPTmolecule liner is wearable and far more
Convenient comma no require for oil EPT period of time
Manganese metal outfitted with sideway
tends to make the body construction company comma and the
sideway totally free from abrasion period
Servicing-cost-free propulsion system
EPT locked EPT EPTry not just
certain the stable high torque output of
EPT motor comma its service lifestyle also tremendously
extended when compared with worm and EPT interval The
mechanical lock totally eradicates internal
leakage of EPT force comma in the meantime
Stops the glide comma the blend of two
aspects assured the functionality on the
premier scale period of time
BeEPTs to a new generation of products comma it
used much more EPT EPT comma the propulsion
system doesn apost need schedule oil servicing time period
Servicing-free of charge chassis
The initially EPTed going for walks motor possesses high gradeability to EPT air compressor time period
Dual-velocity strolling system can transfer quickly comma which will preserve the time for displacement time period
The crawler frame floats within the assortment of 15 deg comma equipped with going for walks balance technique comma
it is applied to rough worksite period
Improved engineering EPTry crawler ampbox framework crawler body are durable and
resilient period
Maintenance-totally free thrust wheels comma no need for oil EPT time period
The caterpillar board is set up to stop derailment of the caterpillar period
Optional unEPTed deblocking kind shifting motor interval
Control panel
Unbiased shifting working technique comma GP
drilling rigs adopt 3-EPT-shifting impartial
manage panel with broader see and safer
manipulation comma which employs diverse doing work
angles for the duration of relocating and operating interval
The originally EPTed procedure valves
possesses a lot more reputable performance time period
Centralized management panel supplies handy
operational handle of drilling rig time period
Fast propulsive and lifting procedure lessen the
auXiHu (West Lake) Dis.liary time and enhance the working performance period of time
The propulsive pressure can be modified and
controlled in accordance to the drilling needs period of time
Drive gadget
The initially EPTed EPT oil pump is
characterized by high voltage-resistance comma large
displacement comma a lot more dependable quality and EPT services
lifestyle period of time
Yuchai 70KW turbocharged engine lparEPT
optional rpar is showcased by the sturdy EPT and simple
maintenance time period
Two-grade air filtering gadget ensures the motor to take in the clean air comma getting safe and reliable interval
Oil-drinking water built-in radiator makes certain the normal procedure of the engine and EPT technique beneath the substantial-temperature environment period
Drilling increase
Multi-angle eEPTate practical drilling
growth drills bigger scope comma which can drill
horizontal gap comma EPT and backward dip
angle gap as well as the lateral dip angle gap time period
In comparison with comparable drilling rigs comma its sectorial
spot of drilling operate exceeds twenty percnt period of time
GPC sequence EPT dry dust EPTor
GPC sequence EPT dry dust EPTor is a matched merchandise EPTly created for surface area DTH drilling rig period It efficiently prolonged the rig aposs services existence comma guaranteed operator aposs security comma reduced the dust pollution comma atmosphere welcoming interval
GPC sequence dust EPTor is a new type high-performance impulse EPTor comma with higher EPTing efficiency comma large processing blow price comma stable functionality comma hassle-free procedure comma effective soot cleaning comma durable filter cartridge comma significantly less routine maintenance work comma beEPTs to top leading degree in the subject of china EPTing equipment time period
Consummate after sale services
Substantial-productive right after sale provider system comma EPT provide the drill rig aposs total variety of following sale service and technical help comma new EPT aposs set up comma commissioning and education at site and continually offer the spare elements and consumables time period Our experts are strictly and skillfully EPTized comma with abundant of encounters and common with our rig period So no subject when and in which comma if you require comma our technicians can show up on your jobsite well timed to fix troubles for you easily time period